Who would build it, and where?
We propose one prime systems integrator, specialist teams for the chassis, passenger cabin and animated shell, and installation and service in the UAE. No manufacturer or factory location has been selected.
Does it walk on its legs?
The more feasible first version uses a load-bearing electric wheeled platform with separately animated legs. True load-bearing walking is a separate research track, not a passenger vehicle promise.
When could guests ride?
The first tests use ballast instead of passengers on a prepared, closed route. Passenger operation depends on independent inspection, applicable approvals, insurance and operator training. Dunes and public roads are not in scope for the first version.
What would it cost, and how long would it take?
We agree the scope and cost ceiling of feasibility before starting. A build price and schedule follow site selection, design, supplier proposals and applicable requirements. There is no binding price or delivery date today.
What does commissioning No. 001 mean?
You help define the look, site and intended use. You receive the feasibility findings and a test plan with observable pass criteria before deciding to proceed or stop. Your name and site stay private unless separately authorized.
Who would service it?
The feasibility brief includes a UAE service plan, parts and operator training. No service provider has been appointed.
What would stop the project?
Before commissioning a build, we need a written classification for the site and use, an accountable integrator under contract, and an independent inspection plan with measurable acceptance criteria. Before guests ride, we need witnessed ballast tests for stability, braking and safe stop, and the appropriate insurance and approvals. No. 001 means the proposed first unit; it does not grant exclusivity.